SEDENA WIND FARM

CGAL, as part of its commitment to environmental protection, entered into the clean energy generation field through the construction of a wind farm for Sedena (National Defense Ministry). This project calls for the supply and installation of five 3 000 kW at 34.5 kv wind generators, including electrical substation, transmission lines in medium and high voltage, employee training and start-up operations. The project calls for engineering, procurement and construction for:

  • Installation of 8 202 ft of medium-tension electrical network (34.5 kv) for the wind generators interconnection to the farm’s own voltage elevation substation.
  • Electrical power substation from 34.5 kv to 115 kv, with a threephase transformation bank with a 15/20 mva capacity.
  • A 17.7 mi-long high-tension transmission line at 115 kv, one circuit, three phases with lattice tower structures and foundation pilings for the wind farm interconnection with the Ixtepec Federal Power Commission substation.

Capacidad de producción nominal total de energía eléctrica / Total Nominal Electric Power Production Capacity

15 mW (+-2%) / 15 mW (+-2%)

Cliente / Client

Secretaría de la Defensa Nacional (Sedena)