CGAL developed the engineering, supply, construction and start-up operations for the Pemex industrial plants located at the Cárdenas North Battery, in Tabasco. This way, it actively achieves its mission in the construction of industrial projects.
The work consisted of one modern automated plant, which will undertake the separation, stabilization, dehydration, desalting and measurement of crude oil; another for the treatment of congenital waters, and a third one for water potabilization. Additionally, the interconnection of a 36 in pipeline for dehydrated petroleum, which goes to the Palomas Crude Commercialization Center, was effected, including auxiliary services required for the handling of the Mora Battery production and the flows of hydrated oil from the Paredón and Bellota batteries.